On site, every clash discovered at installation costs time, rework and friction between trades. BIM can anticipate a large share of them, provided it is used to prepare the site and not only to produce drawings.
Where site clashes hide
- The densest areas: service corridors, ceiling voids, plant rooms.
- Interfaces between trades working at different times.
- Late changes not carried into the models.
- Installation sequences: a service installed too early can block another.
Prepare zone by zone
Before each work zone, review the up-to-date federated model: available depth, service layering, access, supports. Check that the drawings issued to site match the latest approved revision. This short preparation step avoids many installation stoppages.
Think about installation sequence
A model shows services that coexist, not the order they will be installed in. For critical zones, agree the sequence with the trades: who goes first, what must be left clear, where lifting access runs.
Keep the model up to date
An unrecorded site change creates a gap that resurfaces later. A simple rule helps: every change agreed in a meeting triggers an update of the trade model, checked at the next upload.
Use the model on site
Tablets, IFC viewers, printed 3D views of complex zones: the site team must be able to consult the reference without going through the BIM manager’s workstation.
Anticipating site clashes extends our MEP and all-trades coordination through to installation.