EXPERTISE · BIM · DESIGN COORDINATION · ALL TRADES

BIM and design coordination: bringing coordination to completion.

OF PRACTICE IN DESIGN AND CONSTRUCTION · IFC · BCF · OPEN FORMATS AND TRACEABILITY · ISO 19650 · PRINCIPLES APPLIED · ALL TRADES · ARCHITECTURE, STRUCTURE, MEP, FAÇADES

Early-stage coordination, construction-stage MEP coordination, interior and envelope coordination, BIM management: what these services actually involve, how they are run and what they change on a complex project. An in-depth page drawing on more than twelve years of practice in design and construction.

  • 12+ years
01 · UNDERSTANDING BIM

BIM is not a 3D model: it is a way of organising information

Before talking about clashes or software, the team needs to agree on what is produced, who produces it and how information flows. That is what makes a model genuinely useful to the project.

MODEL OR PROCESS

01

3D model or BIM process

A 3D model describes geometry. A BIM process organises how information-rich objects are produced, exchanged and checked: who models what, to which level of information, in which format and by when. Without that framework, even a highly detailed model is hard to use.

DIMENSIONS AND USES

02

Uses before dimensions

People often talk about 4D (sequencing), 5D (quantities and cost) or 6D–7D (operation and maintenance). The numbering varies from one source to another: what matters is defining the uses actually required at the outset, because they drive how the models are structured.

DATA

03

Information before geometry

A duct, a wall or an air handling unit carries properties: classification, level, material, performance, originating trade. The level of information needed is defined by use and by stage. Missing or misclassified data distorts quantities as much as clash results.

INTEROPERABILITY

04

IFC and BCF: the open formats

IFC (ISO 16739-1) lets models move between software without depending on a single vendor. BCF carries the issues: a view, a comment, an owner, a status. Together they make coordination traceable, whatever tool each party uses.

CDE

05

The common data environment

The CDE is the single place where information containers are uploaded, versioned and approved. ISO 19650 defines states within it: work in progress, shared, published, archived. Everyone works on the right revision, and the history of exchanges is kept.

ROLES

06

Who does what on a BIM project

The client sets out its information requirements. A client-side BIM adviser helps define and check them. The BIM manager sets up and runs the project framework. The BIM coordinator assembles and checks the models. The design coordination lead brings the designs together and drives the decisions.

02 · DESIGN COORDINATION

Four levels of coordination, four moments in the project

Coordination does not start when construction begins. Each stage calls for a different level of coordination, with its own objectives, stakeholders and deliverables.

CONCEPT TO TECHNICAL DESIGN

01

Early-stage coordination

OBJECTIVE

Securing the principles before the designs freeze: plant room footprints, risers and shafts, ceiling and plenum depths, distribution routes, principal penetrations through the structure.

WHAT IT PREVENTS

Unworkable ceiling heights, undersized plant rooms, structure to be reworked once services are sized.

DELIVERABLES

Principle sections, plant space layouts, assumption notes shared with the design team.

CONSTRUCTION STAGE · SUBMITTALS

02

Construction-stage MEP coordination

OBJECTIVE

Aligning the technical trades' construction designs, HVAC, plumbing, power and ELV, sprinklers, smoke control, with the structure and architecture, zone by zone and level by level.

WHAT WE COORDINATE

Service layering, available depths, clearances between services, builder's work openings, supports, maintenance access and drainage falls.

DELIVERABLES

Approved coordinated drawings and sections, builder's work drawings, federated model, issue register.

INTERIORS

03

Interior and ceiling coordination

OBJECTIVE

Ensuring consistency between architecture, partitions, ceilings and building services: ceiling grids, terminals, light fittings, detectors, access panels, internal doors and joinery.

WHAT IT PREVENTS

Ceilings that clash with services, badly placed terminals, finishes reworked at the end of the job.

DELIVERABLES

Coordinated reflected ceiling plans, setting-out drawings, partition and architectural opening layouts.

ENVELOPE

04

Building envelope coordination

OBJECTIVE

Coordinating the envelope interfaces: façades, external openings, primary structure, waterproofing, fixings, installation tolerances and insulation continuity.

WHAT IT PREVENTS

Façade fixings that do not suit the slab edges, waterproofing defects, costly remedial work on the envelope.

DELIVERABLES

Coordinated interface details, opening and cast-in insert drawings, façade / frame open-issues register.

03 · COORDINATION METHODS

Coordinating is not just detecting clashes

Software can produce thousands of clashes in minutes. The value of coordination lies in what comes next: sorting, understanding, deciding and closing out each issue with the right person.

CONFIGURE

01

Detection rules tailored to the project

Trade-against-trade matrices, differentiated tolerances (hard clash, insulation clearance, installation or maintenance space), justified exclusions. Poorly configured detection produces noise, or worse, hides the real conflicts.

QUALIFY

02

Group by cause, rank by impact

A hundred clashes may come from a single misplaced service run. We group by cause, separate blockers from minor adjustments, and deal first with what affects the structure, openings and the programme.

CLOSE OUT

03

Decide, assign, verify

Each issue gets an owner, a deadline and a solution agreed in the meeting. Issues travel in BCF, the register keeps the history, and the fix is checked on the next model revision.

04 · USE CASES

Eight real coordination situations, and how they are handled

Typical cases from services-intensive projects, presented generically. For each one: the problem, the risk, how to spot it, the resolution and what closes it out.

CASE 01 · HVAC × STRUCTURE

01

A duct running into a downstand beam

THE PROBLEM

A large supply duct crosses a downstand beam in the ceiling void.

THE RISK

Lost ceiling height, or a late penetration through a load-bearing element.

HOW TO SPOT IT

Duct / structure detection with an insulation clearance, then a section at the crossing point.

THE RESOLUTION

Compare an offset below the beam, a penetration approved by the structural engineer, or a switch to a flat-oval duct.

WHAT CLOSES IT OUT

Dimensioned coordination section, approved opening request, decision note.

CASE 02 · POWER × HVAC

02

Cable trays and ductwork at the same level

THE PROBLEM

Power cable trays and ventilation ductwork cross with no defined layering order.

THE RISK

Cables cannot be pulled, access is blocked, safety clearances are not met.

HOW TO SPOT IT

Zone-by-zone layering review in the federated model, clearance checks between services.

THE RESOLUTION

Set a height rule for each trade and dedicated crossing zones, then have the routes realigned.

WHAT CLOSES IT OUT

Layering rule issued, typical sections, BCF issues assigned.

CASE 03 · OPENINGS

03

Missing or misplaced builder's work openings

THE PROBLEM

A wall penetration does not appear on the builder's work drawings issued to the frame contractor.

THE RISK

Core drilling after the pour, or even structural remedial work and delay.

HOW TO SPOT IT

Automatic listing of penetrations by level, compared with the openings drawn.

THE RESOLUTION

Consolidated builder's work drawings approved before the pour, cross-checked by the structural engineer.

WHAT CLOSES IT OUT

Revised builder's work drawings, approval schedule, tracking of discrepancies.

CASE 04 · TERMINALS × ARCHITECTURE

04

Terminals that do not suit the architecture

THE PROBLEM

A diffuser or grille lands on a ceiling grid joint or in a glazed area.

THE RISK

Ceilings or terminals reworked, architectural finish compromised.

HOW TO SPOT IT

Overlay of terminals and the ceiling grid, review with the architect.

THE RESOLUTION

Move the terminals onto the grid, adapt the connecting ductwork, approve the ceiling layout.

WHAT CLOSES IT OUT

Coordinated reflected ceiling plan, architect's approval.

CASE 05 · CEILINGS

05

Ceilings, lights, sprinklers and detectors

THE PROBLEM

Light fittings, sprinkler heads, detectors and diffusers compete for the same ceiling tile.

THE RISK

Fire safety non-compliance, rework of installed items at the end of the job.

HOW TO SPOT IT

Ceiling grid check against regulatory distances and setting-out constraints.

THE RESOLUTION

A single ceiling layout combining lighting, HVAC and fire safety, agreed with each trade.

WHAT CLOSES IT OUT

Coordinated ceiling layout, open-issues list by trade.

CASE 06 · ENVELOPE

06

Façade, openings, structure and waterproofing

THE PROBLEM

Curtain wall brackets cannot find proper bearing on the slab edge.

THE RISK

Waterproofing defects, inserts to be redone, delay to the building envelope.

HOW TO SPOT IT

Review of façade / frame interface details and installation tolerances.

THE RESOLUTION

Position inserts and brackets early, coordinate the sequence of façade and waterproofing works.

WHAT CLOSES IT OUT

Approved interface details, cast-in insert drawings, façade / frame register.

CASE 07 · HEIGHTS

07

A services corridor that is too low

THE PROBLEM

The stack of services exceeds the depth available between slab and ceiling.

THE RISK

Clear height not compliant, or services that cannot be installed.

HOW TO SPOT IT

Systematic sections at the densest points, height check by zone.

THE RESOLUTION

Rank the services, reroute some of them, agree the ceiling height with the design team.

WHAT CLOSES IT OUT

Coordination sections at critical points, formal decision record.

CASE 08 · CONSISTENCY

08

Models, drawings and site drifting apart

THE PROBLEM

An issued drawing no longer matches the model, or a site change is not recorded.

THE RISK

Work carried out on an out-of-date basis, clashes reappearing during installation.

HOW TO SPOT IT

Check of revisions and dates in the CDE, model / issued-drawing comparison.

THE RESOLUTION

A single issue procedure, a consistency check before each approval, models kept up to date.

WHAT CLOSES IT OUT

Revision tracking schedule, issue procedure.

05 · HOW WE WORK

A nine-step method, from scoping to deliverables

The thread is always the same: understand before choosing tools, scope before producing, and follow each issue through to close-out.

STEP 01

01

Understand the project

Brief, stage, organisation, programme constraints and the client's real expectations.

STEP 02

02

Review the documents

Specifications, drawings, available models, the client's BIM requirements and any existing BIM Execution Plan.

STEP 03

03

Scope the service

Scope, responsibilities, modelling and coordination rules, exchange formats, schedule.

STEP 04

04

Analyse the interfaces

Identify dense areas and critical points: plant rooms, risers, ceiling voids, façades.

STEP 05

05

Organise the exchanges

Meeting rhythm, CDE upload workflows, how issues are distributed.

STEP 06

06

Qualify and prioritise

Each issue is grouped by cause, ranked by criticality and assigned to the trade concerned.

STEP 07

07

Find the solutions

With the parties involved: reroute, opening, level change, formal decision.

STEP 08

08

Check and track

Fixes verified on the next revision, history of decisions and open issues.

STEP 09

09

Produce and issue

Coordinated drawings, reports, registers and models delivered in the agreed formats and revisions.

ADAPTING THE METHOD

The same rigour, applied differently for each service

CONSULTANCY AND STRATEGY

01

Diagnose before recommending

Steps 1 to 3 dominate: interviews, review of recent projects, gaps between practice and requirements, a prioritised roadmap.

BIM MANAGEMENT

02

Set up the framework and keep it alive

BIM Execution Plan, roles, CDE and quality checks are central; coordination is steered through indicators and hold points.

BIM COORDINATION

03

Make every revision reliable

Steps 4 to 8 repeat at each model upload: check, detect, qualify, decide, verify.

EARLY-STAGE COORDINATION

04

Validate the principles early

Work on footprints, heights and principal openings, in close dialogue with the design team and the structural engineer.

CONSTRUCTION-STAGE COORDINATION

05

Close out zone by zone

Regular coordination meetings, coordinated and builder's work drawings, close tracking of open issues through to approval.

SUPPORT

06

Join an existing team

Work with the tools and rules already in place, get up to speed quickly, without reinventing the project's organisation.

06 · TOOLS

Tools that serve a method, not the other way round

The choice of tool depends on the project, the parties and the client's requirements. What matters is a consistent chain: production, checking, coordination, traceability.

MODELLING

01

Revit

Producing and reworking architecture, structure and MEP models; checking model structure and parameters.

COORDINATION

02

Navisworks

Model federation, configured clash detection, zone reviews and preparation of coordination meetings.

CHECK

03

Solibri

Rule-based quality checking of IFC models: consistency, classification, properties, duplicates and compliance with requirements.

AUTOMATION

04

Dynamo

Automating repetitive tasks: populating parameters, checks, data extraction, generating openings.

OPEN FORMAT

05

IFC

Model exchange between software and parties, with export rules defined by use.

TRACEABILITY

06

BCF

Issues located in the model, assigned and tracked from one revision to the next, independently of the software.

COLLABORATION

07

CDE and collaboration platforms

Upload, versioning, approval workflows and distribution. The CDE is chosen by the project; the method adapts to it.

07 · DELIVERABLES

What a design coordination service delivers

Deliverables that support decisions and construction, not reports of several hundred pages that nobody reads.

DRAWINGS

01

Coordinated drawings and sections

A shared reference for the construction designs, dimensioned at critical points and approved by the trades concerned.

OPENINGS

02

Builder's work drawings

Openings, sleeves and penetrations through walls and slabs, consolidated and approved before the pour.

MODEL

03

Federated coordination model

A checked assembly of each trade's models, up to date with the latest approved revision.

TRACKING

04

Issue register

Each issue with its cause, owner, deadline and status, exchanged in BCF.

DECISIONS

05

Minutes and decision notes

Decisions taken in coordination meetings, recorded and distributed to all parties.

FRAMEWORK

06

BIM Execution Plan, standards and quality checks

BIM Execution Plan, modelling rules and model check reports, depending on the scope of the service.

08 · THE FOUNDER

Behind EUNIQ, an engineer who knows the site

EUNIQ was founded by Youssef, an ENTPE engineering graduate with an Advanced Master's in BIM from École des Ponts and ESTP, and a management degree from IAE. More than twelve years of BIM, design coordination and interface management, in design and in construction.

EDUCATION

01

A dual perspective, technical and organisational

An ENTPE engineering degree and an Advanced Master's in BIM from École des Ponts and ESTP, complemented by management studies at IAE: understanding buildings, and the organisations that deliver them.

EXPERIENCE

02

BIM management, coordination and interface management

BIM management, BIM coordination and MEP and architectural coordination on commercial, industrial, infrastructure and complex public projects.

ENVIRONMENTS

03

Services-intensive projects

Data centres, pharmaceutical facilities, healthcare buildings, leisure destinations, high-rise buildings and infrastructure: settings where a poorly handled interface is expensive.

DIALOGUE

04

Speaking every discipline's language

Architects, structural and MEP engineers, contractors, clients and project directors: turning a technical problem into options, then into a decision.

STANDARDS

05

ISO 19650, IFC, BCF, CDE

Hands-on use of the ISO 19650 information management principles, open formats and common data environments, applied at the right level for each service.

APPROACH

06

Step back, structure, close out

Scope before producing, separate the urgent from the important, and follow each issue through to close-out: that is the difference between detecting and coordinating.

Throughout his career, Youssef has contributed to projects for Disney Imagineering, RATP Real Estate, SNCF and BNP Paribas: demanding clients who placed their trust in him.

09 · GLOSSARY

Key terms for running a BIM project

01

BIM

Building Information Modelling: a method for producing and managing information about a built asset using information-rich models.

02

FEDERATED MODEL

The models of each trade assembled in a shared coordinate system, used for coordination.

03

IFC

An open exchange format for BIM models, standardised as ISO 16739-1.

04

BCF

An exchange format for issues: view, comment, owner and status, readable in different software.

05

CDE

Common data environment: the space where information is uploaded, versioned, approved and distributed.

06

BIM PROTOCOL

The document setting out a project's objectives, uses, roles, and modelling and exchange rules.

07

BIM EXECUTION PLAN

The delivery team's response to the client's requirements: organisation, tools, deliverables and schedule.

08

LEVEL OF INFORMATION NEED

What each object must contain, in geometry and data, at a given stage and for a given use.

09

CLASH

A conflict between elements: physical collision, minimum clearance not met, or inconsistent data.

10

BUILDER'S WORK OPENING

An opening planned in a structural element or partition for a service to pass through.

11

COORDINATED DRAWING

A drawing coordinated across all trades, used as the reference for construction designs and on site.

12

ALL TRADES

All trades: every architectural, structural and building services package on a project.

10 · FREQUENTLY ASKED QUESTIONS

The questions project teams ask

When should design coordination start?

As early as possible: early-stage coordination at concept or developed design secures footprints and heights, and makes construction-stage coordination much smoother. Started after works begin, it corrects more than it anticipates.

Are design coordination and BIM coordination the same thing?

No. BIM coordination makes the models reliable and deals with clashes. Design coordination goes further: it settles routing decisions between trades and produces drawings that become the reference for construction.

Does the whole project need to be modelled?

No. Coordination can work from a mix of 2D drawings and models. BIM makes it more reliable and traceable, but the method stays the same: compare, decide, approve.

What do we do with a report of several thousand clashes?

Review the detection rules and tolerances, group by cause, then deal first with what affects the structure, openings and dense areas. A useful report comes down to a few dozen qualified issues.

Can EUNIQ step in mid-project?

Yes: taking over coordination that has fallen behind, supporting an existing team, or a targeted service on a critical zone. Scoping starts with a review of the models and open issues.

Is EUNIQ ISO 19650 certified?

No. EUNIQ applies the principles of the ISO 19650 series at the scale of each service: information requirements, responsibilities, approval workflows and traceability.