Reflected ceiling plans
Ceiling grids, terminals, light fittings, detectors and sprinkler heads set out on the grid.
EUNIQ SYNTHÈSE · ARCHITECTURAL COORDINATION
Ceilings, partitions, terminals, light fittings, detectors, access panels, façades: we coordinate what is seen with what is hidden, so the design intent survives through to handover.
It picks up where technical coordination meets visible architecture. The goal: ceilings, partitions and façades consistent with the services, with no finishes reworked at the end of the job.
Ceiling grids, terminals, light fittings, detectors and sprinkler heads set out on the grid.
Consistency between partitions, risers, openings and doors, including fire-rated walls.
Clear heights and bulkheads checked in visible areas.
Interfaces between façade, structure, waterproofing, blinds and services.
Panels placed where the plant needing maintenance actually is.
Proposals reviewed with the architect and deviations agreed.
It starts before final ceiling layouts and ends with the installation of finishes.
LATE DESIGN
Ceiling grids, visible service zones, terminal setting-out rules.
CONSTRUCTION
Overlaying technical and architectural designs, coordinated ceiling and partition layouts.
FAÇADES
Façade / frame interface details, cast-in inserts, installation tolerances.
FIT-OUT
Answering installation queries and consistency checks before ceilings are closed.
Terminals, lights, detectors and access panels set out on the grid.
Ceilings, finishes and repetitive elements aligned with services.
Partitions, doors and architectural openings consistent with services.
Clear heights checked in visible areas.
Façade, openings, structure and waterproofing.
Items to agree with the architect, with their status.
OUR RESPONSE
Systematic overlay of terminals and grid, relocation on the grid and architect sign-off.
OUR RESPONSE
A single ceiling layout combining lighting, HVAC and fire safety, agreed with each trade.
OUR RESPONSE
Review of façade / frame details and inserts positioned before the pour.
OUR RESPONSE
Consistency checks before ceilings and linings are closed.
The finished building looks like the design.
Finishes are not taken down to move equipment.
Access panels in the right place, plant reachable.
Decisions are taken with the architect, not against them.
Main contractors on office, hospitality, healthcare and public projects where interior quality matters, and architects who want to secure ceilings and façades at construction stage.
On services-intensive projects with demanding finishes, yes. One resolves the services, the other integrates them into the visible architecture.
Always. Proposals go to the architect and deviations are agreed with them.
Yes, the interfaces between façade, structure, waterproofing and services, with the façade contractor.
Both. We use models where they exist, and drawings otherwise.
Send us your input data: drawings or models, brief, programme, BIM requirements. We come back to you with a proposal matched to your project stage and organisation.
CALL BACK WITHIN 24 H
An engineer contacts you to clarify scope, trades involved, timescales and deliverables.
PROPOSAL WITHIN 48 H
A commercial proposal can be sent within 48 hours of receiving your input data.