BIM SERVICES · BIM MANAGEMENT · DESIGN & MEP COORDINATION

BIM services, design coordination & MEP coordination.

PROPOSAL · AFTER INPUT DATA · ALIGNED INFORMATION MANAGEMENT · AREAS OF EXPERTISE · HANDS-ON PROJECT EXPERIENCE

BIM management, design and MEP coordination, clash detection, BIM strategy and training. EUNIQ supports main contractors, engineering consultancies, design teams and clients in de-risking design, resolving conflicts before they reach site and delivering complex projects with confidence.

48 h
Proposal after input data
ISO 19650
Aligned information management
5
Areas of expertise
12+ yrs
Hands-on project experience
OUR SERVICES IN DETAIL

Six services, two practices: EUNIQ Consulting and EUNIQ Synthèse

Each service has its own page: what it covers, when we step in, deliverables, problems solved and what you gain.

EUNIQ CONSULTING

01

BIM Management

BIM management for general contractors: BIM Execution Plan, processes and coordination of all parties.

EUNIQ SYNTHÈSE

02

MEP & All-Trades Coordination

Coordination of structure, HVAC, plumbing, electrical, fire systems and architecture.

EUNIQ SYNTHÈSE

03

Architectural Coordination

Spatial coordination, architectural and services interfaces, coordinated drawings and sections.

EUNIQ CONSULTING

04

BIM Coordination

Model federation, clash detection, issue tracking and BCF exchanges.

EUNIQ CONSULTING

05

BIM Consulting & ISO 19650

Review of practices, processes, BIM requirements and information quality, with recommendations.

EUNIQ CONSULTING

06

BIM Modelling

Revit, IFC, modelling and design support at design and construction stages.

01 · YOUR CHALLENGES

When clients bring us in

On complex projects, coordination problems rarely surface at the right time. The later a clash is found, the more it costs to fix: redesign, revised builder's work openings, rework on site.

01

Clashes between services and structure

Ductwork, pipework and cable containment crossing beams, walls or slabs without an agreed solution.

02

Fragmented collaboration

Information that doesn't flow between architect, engineers, contractors and client.

03

Inconsistent BIM models

Models with mismatched levels of detail, origins or naming conventions.

04

Unreliable data

Missing or inconsistent properties that undermine quantities, checks and handover.

05

Missed builder's work openings

Penetrations identified after the pour, leading to core drilling and rework.

06

Clashes found too late

Conflicts discovered on site, when every change hits the programme.

07

Weak BIM governance

A BIM Execution Plan nobody follows, unstructured exchanges, deliverables that are hard to check.

08

Unclear accountability

Open issues with no owner or due date, and corrective actions that never close out.

09

Short-term capacity gaps

A coordination or BIM team that needs reinforcing for a peak workload or a critical stage.

Recognise any of these? Tell us about your project — a first conversation is often enough to identify the right approach.

02 · OUR EXPERTISE

Five areas of expertise, one standard: reliable information

Every engagement is shaped around your project: a targeted assignment, extra capacity for your team, or end-to-end support from design through to construction.

01

BIM Management

Set up, run and audit the project's BIM process.

02

Design & MEP Coordination

Prove the design fits together before construction.

03

BIM Coordination

Triage clashes and drive them to resolution.

04

BIM Strategy & Consulting

Build an approach that fits your organisation.

05

Training & Support

Make your teams self-sufficient.

EXPERTISE 01

BIM Management

THE CHALLENGE

Without proper management, a BIM project produces models — but not necessarily usable information. BIM management defines what the models must contain, who produces them, in what format and to what programme, then checks that this framework is followed throughout the project.

SCOPE OF SERVICES

  • Setting up and structuring the BIM process
  • Defining BIM goals and uses
  • Drafting or reviewing the BIM Execution Plan (BEP)
  • Defining roles and responsibilities
  • Structuring collaborative workflows
  • Managing the common data environment (CDE)
  • Monitoring deliverable compliance
  • Coordinating stakeholders
  • Model and data quality assurance
  • Supporting project teams

APPROACH

Review of the contractual context and client requirements, definition of uses and deliverables, set-up of exchange workflows and checks, then regular monitoring with defined hold points.

TYPICAL DELIVERABLES

  • BIM Execution Plan, or input to the BEP
  • Responsibility matrix
  • Model structuring guidelines
  • CDE and information exchange procedures
  • Model QA reports
  • Deliverable tracking schedules

WHAT YOU GAIN

  • Clear requirements for every party
  • Models you can actually use, not just view
  • A full audit trail of exchanges and approvals
  • Fewer rounds of comments on deliverables

WHEN TO CALL ON EUNIQ

A project starting in BIM, a BEP to write or enforce, no dedicated BIM Manager, or client information requirements to turn into a workable organisation.

EXPERTISE 02 · CORE DISCIPLINE

Design & MEP Coordination

THE CHALLENGE

Known in French practice as synthèse, this discipline overlays the architectural, structural and building services designs to prove — before construction — that everything fits: routes, clearances, ceiling void depths, builder's work openings and maintenance access. It is one of EUNIQ's core areas of expertise.

SCOPE OF SERVICES

  • Early-stage coordination: service zones and routing principles during design
  • Construction-stage MEP coordination: aligning HVAC, plumbing, electrical and sprinkler designs
  • Architectural coordination: architecture, structure, partitions and ceilings working together
  • Coordination of services and plant
  • Structure, architecture and MEP interfaces
  • Builder's work openings: penetrations, sleeves, openings in walls and slabs
  • Routing and installation constraints
  • Clash resolution
  • Building envelope coordination where the project requires it
  • Tracking comments and corrections

HOW COORDINATION DE-RISKS CONSTRUCTION

Anticipate rather than correct

01 — ANTICIPATE

Conflicts are found on drawings or in the model, while fixing them only costs a design revision.

02 — RESOLVE

Each clash is reviewed in coordination meetings and settled with the relevant trade: reroute, level change or builder's work opening.

03 — SIGN OFF

Approved coordinated drawings become the reference for detailed design and site preparation.

APPROACH

Collecting and checking each trade's drawings or models, federation, zone-by-zone and level-by-level review, regular coordination meetings, issue of comments, then verification of corrections through to sign-off of the coordinated drawings.

TYPICAL DELIVERABLES

  • Coordinated services drawings and sections
  • Federated coordination model
  • Builder's work (openings) drawings
  • Issues and comments log
  • Coordination meeting minutes
  • Progress tracking by zone

WHAT YOU GAIN

  • Construction designs that work across trades
  • Openings agreed before the pour
  • Less rework on site
  • Documented, shared decisions

WHEN TO CALL ON EUNIQ

Start of construction-stage design, high services density (offices, data centres, industrial sites, healthcare), coordination falling behind, or an in-house coordination team that needs support.

EXPERTISE 03

BIM Coordination & Clash Detection

THE CHALLENGE

BIM coordination is far more than running automated clash detection. A report listing thousands of raw clashes helps no one: the value lies in triaging conflicts, prioritising them and following each action through to resolution.

SCOPE OF SERVICES

  • Model coordination
  • Clash detection using project-specific rules
  • Clash triage and prioritisation
  • Interference analysis
  • Assigning responsibilities
  • Tracking corrective actions
  • Checking model updates
  • Producing and tracking coordination reports
  • Supporting coordination meetings

FROM DETECTION TO DECISION

A clash only matters once it is triaged

01 — GROUP

Hundreds of clashes can share a single root cause: a misplaced service run, an offset beam.

02 — PRIORITISE

Clashes that block construction come before minor adjustments.

03 — TRACK

Every issue has an owner, a due date and a status checked against the next model issue.

APPROACH

Defining clash matrices and tolerances, grouping conflicts by root cause, reviewing critical issues with each trade, then checking every new model issue.

TYPICAL DELIVERABLES

  • Clash detection matrix
  • Illustrated coordination reports
  • Clash register: status, owner, due date
  • Progress dashboards
  • Decision records

WHAT YOU GAIN

  • Clashes you can act on
  • Clear accountability
  • Visibility on resolution progress
  • Meetings focused on decisions

WHEN TO CALL ON EUNIQ

Projects with several trades modelling in BIM, clash reports that are hard to use, unproductive coordination meetings or a growing backlog of open issues.

EXPERTISE 04

BIM Strategy & Consulting

THE CHALLENGE

Adopting BIM is not just about buying software. It means adapting processes, skills and organisation to your projects and your clients. A realistic strategy starts from where you are today, not from a theoretical model.

SCOPE OF SERVICES

  • BIM maturity assessment
  • Needs analysis
  • Defining a tailored BIM strategy
  • Support with process implementation
  • Bid support on BIM requirements
  • Defining information requirements and deliverables
  • Improving working methods
  • Supporting organisations and teams

APPROACH

Interviews with your teams, review of recent projects and current tools, gap analysis, then a prioritised, realistic roadmap matched to your resources.

TYPICAL DELIVERABLES

  • Assessment report
  • BIM roadmap
  • Exchange Information Requirements (EIR) or BIM brief
  • BEP and procedure templates
  • Input to bid submissions

WHAT YOU GAIN

  • A clear view of where you stand
  • Priorities that match your resources
  • Stronger bids
  • An approach your teams buy into

WHEN TO CALL ON EUNIQ

Setting up a BIM team, a tender with BIM requirements, tools rolled out without visible gains, or the need for an outside view of your practices.

EXPERTISE 05

Training & Support

THE CHALLENGE

Processes only add value when people understand and apply them. EUNIQ's training draws on real project situations and on the tools your teams actually use.

SCOPE OF SERVICES

  • BIM process training
  • Project team support
  • Awareness of coordination challenges
  • Methodological support
  • Tools and best practice (Revit, Navisworks, IFC exchanges)

APPROACH

Assessment of needs and starting level, a tailored programme mixing method and hands-on exercises on real-world cases, then on-the-job support if needed.

TYPICAL DELIVERABLES

  • Tailored training programme
  • Training materials
  • Hands-on exercises
  • Best-practice guides

WHAT YOU GAIN

  • Teams that become self-sufficient faster
  • Consistent practices
  • Better adherence to the BEP
  • Tracked skills development

WHEN TO CALL ON EUNIQ

New tools, a first BIM project, new staff to onboard, or practices to align across teams or offices.

03 · UNDERSTANDING BIM

BIM and coordination, explained simply

Key concepts for decision-makers who want to understand how coordination works and talk confidently with their teams and partners.

What is BIM?

BIM (Building Information Modelling) is a way of working built on information-rich digital models: every object — a wall, a duct, an air handling unit — carries data such as dimensions, materials and performance. The model becomes a shared database for the whole project team.

A 3D model or a BIM process?

A 3D model represents geometry. A BIM process organises how information is produced, exchanged and checked: who models what, to what level of detail, in which format and by when. Without that framework, even the best model is hard to use.

What does BIM achieve on a project?

More reliable design, clashes resolved before site, better quantities, faster decisions and structured data ready for operation and maintenance.

Who does what?

The client sets out its information requirements. The BIM Manager defines and runs the framework. The BIM Coordinator checks and federates the models. The design coordinator overlays the designs and drives decisions. Modellers produce each trade's models.

Why does model quality matter?

Clash detection is only as reliable as the models: shared origin, consistent levels, correctly classified objects, complete properties. Upfront QA avoids chasing false clashes — or missing real ones.

What is a common data environment for?

The CDE (Common Data Environment) is the single place where project information is uploaded, version-controlled and approved. Everyone works from the right revision, and every exchange leaves an audit trail.

PROCESS

How does a coordination cycle work?

With every new model issue, the same cycle repeats: models are received and checked, clashes are detected and triaged, decisions are made in coordination meetings, actions are assigned, and fixes are verified in the next issue. A steady rhythm matters more than powerful software.

What is a clash, and how is it resolved?

A clash is a conflict between two elements in the model. There are typically three types:

  • hard clashes: two objects occupy the same space;
  • clearance (soft) clashes: a minimum distance is not respected — insulation, installation, maintenance;
  • workflow and data clashes: an object with missing data, or at odds with the construction sequence.

Resolution always follows the same logic: detect, group by root cause, assess criticality, assign to the relevant trade, fix, then verify.

STANDARD

What the ISO 19650 series brings

The ISO 19650 series sets an international framework for managing information across the whole life cycle of a built asset: information requirements, delivery planning, approval workflows and information container states. It gives every party a common language. EUNIQ applies these principles to the scope of each engagement; it does not claim ISO 19650 certification.

WORKED EXAMPLES

Six common situations resolved through coordination

Frequent issues on services-intensive projects, shown as generic examples.

CASE 01

01

Ductwork and a beam

THE PROBLEM

A duct runs through a beam downstand in the ceiling void.

THE COORDINATED SOLUTION

Reroute below the beam if the void allows, agree an opening with the structural engineer, or resize the duct.

CASE 02

02

Cable tray and pipework

THE PROBLEM

A power cable tray is installed below a water pipe.

THE COORDINATED SOLUTION

Re-stack the services: electrical containment above wet services, with the required separation distances.

CASE 03

03

Missing opening in a concrete wall

THE PROBLEM

A service penetration is missing from the builder's work drawings issued to the concrete contractor.

THE COORDINATED SOLUTION

A schedule of penetrations by level, builder's work drawings issued before the pour and cross-checked against the structural drawings.

CASE 04

04

Blocked maintenance access

THE PROBLEM

A valve or terminal unit sits out of reach, behind another service.

THE COORDINATED SOLUTION

Maintenance zones modelled and access checked from the ceiling hatches.

CASE 05

05

Insufficient ceiling void

THE PROBLEM

Stacked services exceed the depth available between slab and ceiling.

THE COORDINATED SOLUTION

Coordination sections at critical points, service prioritisation, and a trade-off between ceiling height and routing.

CASE 06

06

Ceilings, terminals and luminaires

THE PROBLEM

Diffusers, luminaires, detectors and sprinklers compete within the ceiling grid.

THE COORDINATED SOLUTION

A coordinated reflected ceiling plan integrating HVAC terminals, lighting, fire safety and architectural constraints.

Learn more: our project track record and our practical guide to MEP coordination.

04 · HOW AN ENGAGEMENT WORKS

From first call to final deliverables

A simple, transparent process from the first conversation to handover.

01

Initial call

Understanding your project, its stage, constraints and expectations.

02

Proposal

Call back within 24 hours. Commercial proposal within 48 hours of receiving your input data.

03

Scoping

Objectives, scope, responsibilities, deliverables, communication and deadlines agreed together.

04

Delivery

Production, coordination, meetings and reporting, led by a directly involved point of contact.

05

Close-out

Handover of deliverables, project review and recommendations for the next stages.

05 · OUR COMMITMENTS

Six commitments, made to be kept

Specific commitments rather than broad promises. They shape every engagement, from the first enquiry to final handover.

01 · RESPONSIVENESS

01

Call back within 24 hours, proposal within 48 hours.

Once we have the information needed to assess your requirement. Where a request calls for prior technical analysis, we set out the proposed approach and timeline within the same timeframe.

02 · FLEXIBLE ENGAGEMENT

02

Scaled to your needs, never oversized.

A one-off assignment, a specific project stage, extra capacity for your team, a full engagement or a pilot phase: the format is set around your context and the agreed terms.

03 · STRUCTURED METHODOLOGY

03

Processes organised around the relevant ISO 19650 principles.

Structured information, defined responsibilities, traceable exchanges, checked deliverables. A methodological approach tailored to each engagement — not a certification.

04 · DIRECT INVOLVEMENT

04

A direct relationship and controlled follow-through.

Your point of contact understands the requirement, runs the engagement and oversees the deliverables — no layers between you and the expertise.

05 · CLEAR SCOPE

05

Visibility at every stage.

Objectives, scope, responsibilities, deliverables, communication and deadlines are agreed before work begins.

06 · RESULTS-DRIVEN

06

Expertise focused on the project's real constraints.

Anticipating critical issues, qualifying problems, tracking corrections and working with project teams on practical solutions.

06 · WHY EUNIQ

A specialist practice with a whole-project view

01

Whole-project view

An understanding of how architecture, structure, building services, engineering and site interact.

02

Hands-on approach

Work that responds to the real constraints of the project and its teams, not just paperwork.

03

Agile structure

A targeted assignment, team reinforcement or end-to-end support, as you need it.

04

Process mastery

Structuring, coordinating, managing and checking information in the spirit of ISO 19650.

FOUNDER'S BACKGROUND

Throughout his career, EUNIQ's founder has contributed to projects for Disney Imagineering, RATP Real Estate, SNCF and BNP Paribas: demanding clients who placed their trust in him. View projects

GETTING STARTED

Start with aBIM & coordinationreview.

To assess your needs — and how we work together — without committing to a full engagement, we can begin with a focused pilot phase on a defined scope: a zone, a level, a trade package or a set of models.

WHAT YOU GET

  • An objective view of model quality and coordination status
  • A prioritised list of critical issues
  • Practical improvement areas and an action plan

Scope, duration and terms are agreed with you at the first conversation.

FREQUENTLY ASKED QUESTIONS

Your questions about our BIM services

What is the difference between BIM management and BIM coordination?

BIM management sets up and runs the framework: uses, BEP, responsibilities, checks. BIM coordination handles the day-to-day federation of models and the detection and tracking of clashes. The two are complementary.

What does a design coordination engagement involve?

Overlaying the architectural, structural and building services designs to prove they work together before construction, then producing coordinated drawings that become the reference on site.

Can you reinforce an existing team?

Yes. EUNIQ can support an in-house coordination or BIM team for a project stage or a peak workload, working within your processes and tools.

How quickly will I receive a proposal?

You will be contacted within 24 hours. A commercial proposal can be sent within 48 hours of receiving your input data. Where prior analysis is needed, we propose an approach within the same timeframe.

Is EUNIQ ISO 19650 certified?

No. EUNIQ organises its engagements around the relevant principles of the ISO 19650 series — structured information, responsibilities, approval workflows — tailored to each project's scope.

What types of projects do you work on?

Commercial, industrial, infrastructure, data centres and other technically complex environments, at both design and construction stages.

CONTACT

Tell us about your project

Project, stage, trades involved, deadlines: a few details are enough. You will be contacted within 24 hours, and a commercial proposal can be sent within 48 hours of receiving your input data.

EMAIL

contact@euniq.fr

PHONE

+33 6 16 02 20 33

OFFICE

23 rue Magellan, 77700 Serris, France

Chat on WhatsApp