EUNIQ SYNTHÈSE · TECHNICAL COORDINATION
Structure, HVAC, plumbing, power and ELV, fire systems and architecture: we bring the trades’ designs together, agree routing with each of them and produce coordinated drawings that become the reference for construction.
Coordination is more than detecting clashes. It means fitting every service into the available space, with access, falls and regulatory clearances, and getting each trade to sign up to the agreed solution.
Receiving each trade’s drawings and models, checking revisions, origin and levels.
Plant rooms, risers, ceiling voids, corridors: finding where space runs out.
Height rules by trade, crossing zones, priorities between gravity drainage, ductwork and containment.
Zone-by-zone reviews with the trades, decisions recorded and assigned.
Listing penetrations, consolidating and approving them with the structural engineer before the pour.
Checking fixes, updating coordinated drawings, closing out open issues.
The earlier coordination starts, the less it costs. It then continues zone by zone until installation.
DESIGN
Plant space, risers, ceiling depths and principal structural penetrations.
PRE-CONSTRUCTION
Coordination programme by zone, layering rules, design submission schedule for the trades.
CONSTRUCTION
Overlaying the designs, decisions, approved coordinated and builder’s work drawings.
SITE
Answering installation queries, integrating changes, keeping issued drawings consistent.
By level and zone, dimensioned at critical points, approved by the trades.
Systematic sections at the densest points, with clear heights checked.
Openings, sleeves and core drills consolidated and approved before the pour.
The trades’ models assembled, up to date with the latest approved revision.
Each issue with its cause, owner, deadline and status.
Meeting decisions distributed to all parties.
OUR RESPONSE
Height check by zone, service ranking, rerouting and agreeing ceiling heights with the design team.
OUR RESPONSE
Penetrations listed by level and cross-checked with the structure before each pour.
OUR RESPONSE
Short, regular coordination meetings, written decisions, named owners.
OUR RESPONSE
Prioritising the zones critical to the programme and targeted support to catch up.
Conflicts are resolved on drawings, not during installation.
Openings and decisions arrive before pours and procurement.
A common reference approved by each one, limiting disputes.
Every decision is written, dated and assigned.
Main contractors on design-and-build or construction-stage contracts, MEP contractors joining an existing coordination process, and design teams securing the move from design to construction. We work on services-intensive buildings: offices, healthcare, data centres, industrial facilities.
No. Coordination can work from 2D drawings and models. BIM makes it more reliable and traceable, but the method stays the same.
BIM coordination makes the models reliable and deals with clashes. Technical coordination goes further: it settles routing and produces the reference drawings for construction.
At design stage, with early-stage coordination. At construction stage, before the first builder’s work drawings are issued.
Yes: a targeted service on a critical zone, or support for an existing coordination team.
Send us your input data: drawings or models, brief, programme, BIM requirements. We come back to you with a proposal matched to your project stage and organisation.
CALL BACK WITHIN 24 H
An engineer contacts you to clarify scope, trades involved, timescales and deliverables.
PROPOSAL WITHIN 48 H
A commercial proposal can be sent within 48 hours of receiving your input data.