CASE STUDY · BIM AUTOMATION

Case study: making a Revit model handover-ready with Dynamo

Before project handover, the Revit model had to follow a strict naming standard and feed the schedules of the digital O&M (as-built) documentation. Rather than fixing elements one by one by hand, EUNIQ developed five Dynamo scripts that check, correct and log every change.

  • ContextRevit model at project close-out, digital handover documentation required
  • ToolsRevit, Dynamo, Python and the Revit API
  • OutcomeAutomated checks and fixes, repeatable on every model version
01 · THE CHALLENGE

What made handover risky

At project close-out, accumulated modelling errors come at a price: wrong schedules, unusable handover data, back-and-forth with the client. Six pain points came back with every version.

01

Inconsistent names

Families and types named with no common rule, hard to use in schedules.

02

Missing references

The equipment model number was missing from the type names required for handover.

03

In-place objects

In-place families, hard to check, quantify and reuse.

04

Duplicates

Light fixtures stacked in the same place, skewing quantities.

05

Unused filters

View filters piling up over the project, bloating the model.

06

Manual checks

Long, tedious checks to repeat with every new version.

02 · THE METHOD

Detect, preview, fix, log

Every script follows the same logic: nothing is changed blindly, everything is documented.

STEP 1

01

Detect

Automatic diagnosis: in-place objects, duplicates, unused filters, non-compliant names.

STEP 2

02

Preview

Preview mode: every fix is listed before it is applied.

STEP 3

03

Fix

Renaming to the standard, adding the manufacturer model, removing duplicates.

STEP 4

04

Log

A report on every run; conflicts are flagged for a decision, never settled silently.

03 · THE SCRIPTS

Five custom Dynamo scripts

01

Handover preparation

Adds the manufacturer reference at the start of type names listed in handover schedules.

02

Renaming to the standard

Families and types in capitals, no accents, EL_ prefix, with preview and conflict detection.

03

In-place object detection

Report by category, level and workset, and direct selection in Revit.

04

Duplicate removal

Finds elements of the same type at the same location and keeps a single instance.

05

View filter purge

Compares filters used in views with those in the model and deletes the unused ones.

06

Automatic reports

Each script states what was changed, skipped or left in conflict.

DYNAMO SCREENSHOTS
Dynamo graph, version 6: converting in-place objects into loadable Revit families
05 —

The same check, before and after scaling up

First screenshot, the initial version: detects in-place objects, reports category, family, type, level and workset, and selects them directly in Revit. Second screenshot, version 6: the same graph also converts in-place objects into loadable families (.rfa), with a configurable template and output folder, and can delete the originals once the conversion has been checked.

Dynamo graph, initial version: detecting in-place objects in Revit
04 · WHAT CHANGED

A project that is easier to hand over

01

Repeatable checks

OUTCOME

Every new model version is checked in one click, with exactly the same rules.

02

No blind changes

OUTCOME

Preview mode and reports let you validate before applying.

03

Usable handover data

OUTCOME

Standardised type names carrying the reference the facility manager expects.

04

Documented decisions

OUTCOME

Naming conflicts are listed and settled with the team, not fixed silently.

05 · AND FOR YOU?

What we can automate on your projects

01

Quality control

Naming, parameters, duplicates and in-place objects, at every upload.

02

Handover preparation

Schedules, manufacturer references and operations data.

03

Model clean-up

Filters, views and unused elements, for lighter models.

04

Training your teams

Get started with Dynamo and the Revit API to automate in-house.

05

Where to start

A BIM quick-scan identifies, in a few days, which checks to automate first on your projects.

06 · FAQ

Questions about BIM automation

Do we need to code to use these scripts?

No. They run from Dynamo with simple settings. We train your teams to use them.

Can the scripts follow our standards?

Yes. Prefixes, naming rules, categories and target schedules are configured to your standards.

What are the risks for the model?

Changes run inside an undoable Revit transaction and are logged in a report.

Do you develop custom scripts?

Yes: checking, coordination, handover. We develop Dynamo and Python scripts tailored to your workflows.

AUTOMATE YOUR CHECKS

What if your BIM checks ran on their own?

Tell us about your repetitive checks: we will tell you what can be automated, and how.

CALL BACK WITHIN 24 H

An engineer calls you back to clarify the need, scope and timescales.

PROPOSAL WITHIN 48 H

A commercial proposal can be sent within 48 hours of receiving your input data.

Chat on WhatsApp