INSIGHTS · BIM COORDINATION

IFC model quality control

BY EUNIQ · 5 MIN READ · NOVEMBER 2026

Spatial structure, entities, properties, geometry, georeferencing: what to check in an IFC file and how to make exports reliable.

Automated check of an IFC model

IFC is the open format that lets parties using different software work on the same federated model. It is also a frequent source of trouble: a poorly configured export can lose objects, properties or geometry without anyone noticing before coordination.

Why IFC needs its own checks

A correct native model can produce an incorrect IFC. The result depends on the software, the IFC schema version, export settings and how objects were modelled. Checks must therefore target the IFC file itself.

What to check in an IFC

  • Spatial structure: site, building, storeys, and each object attached to the right storey.
  • Entities: a wall exported as a wall, a duct as a duct, not as a generic proxy.
  • Properties: required property sets present, with consistent values.
  • Geometry: objects missing, distorted or duplicated compared with the native model.
  • Classification used on the project.
  • Georeferencing and units.

Shared checking rules

Tools such as Solibri let you write rule sets by use: coordination, quantities, operation. These rules should be known to the trades and written into the BIM Execution Plan, so each party can check its export before uploading.

Set exports up once

The best prevention is export settings defined by use, shared with each trade at the start, tested on a first upload and kept for the whole project.

IFC quality checking is part of our BIM coordination and BIM consulting services.

02 —

Let’s talk about your project

Receiving IFC models that are hard to use for coordination? Tell us about it through our contact form: you will be contacted within 24 hours, and a commercial proposal can be sent within 48 hours of receiving your input data.

Chat on WhatsApp