Most costly conflicts in a building sit at the interface between structure and building services: a duct running into a beam, a gravity drain with no possible fall, a riser too small for the equipment selected. Coordinating the two requires a method, because they move at different speeds and under different constraints.
Two programmes that do not overlap
The structure is fixed early, because pours do not wait. Services firm up late, as equipment is selected. Coordination has to make these programmes converge: freeze early the penetrations the structure needs, without forcing the trades into choices they cannot yet make.
What to secure first
- Plant room and riser footprints.
- Ceiling void depths under the lowest beams.
- Principal penetration zones through walls and downstands.
- Loads of heavy plant and their supports.